Vulnerability Name:

CVE-2015-4944 (CCN-104517)

Assigned:2015-08-21
Published:2015-08-21
Updated:2015-10-06
Summary:Cross-site scripting (XSS) vulnerability in IBM Maximo Asset Management 7.1 through 7.1.1.13, 7.5.0 before 7.5.0.8 IFIX003, and 7.6.0 before 7.6.0.1 IFIX001; Maximo Asset Management 7.5.x before 7.5.0.8 IFIX003 and 7.6.0 before 7.6.0.1 IFIX001 for SmartCloud Control Desk; and Maximo Asset Management 7.1 through 7.1.1.13 and 7.2 for Tivoli IT Asset Management for IT and certain other products allows remote authenticated users to inject arbitrary web script or HTML via a crafted URL.
CVSS v3 Severity:2.6 Low (CCN CVSS v3.1 Vector: CVSS:3.1/AV:N/AC:H/PR:L/UI:R/S:U/C:N/I:L/A:N)
Exploitability Metrics:Attack Vector (AV): Network
Attack Complexity (AC): High
Privileges Required (PR): Low
User Interaction (UI): Required
Scope:Scope (S): Unchanged
Impact Metrics:Confidentiality (C): None
Integrity (I): Low
Availibility (A): None
CVSS v2 Severity:3.5 Low (CVSS v2 Vector: AV:N/AC:M/Au:S/C:N/I:P/A:N)
Exploitability Metrics:Access Vector (AV): Network
Access Complexity (AC): Medium
Authentication (Au): Single_Instance
Impact Metrics:Confidentiality (C): None
Integrity (I): Partial
Availibility (A): None
3.5 Low (CCN CVSS v2 Vector: AV:N/AC:M/Au:S/C:N/I:P/A:N)
Exploitability Metrics:Access Vector (AV): Network
Access Complexity (AC): Medium
Athentication (Au): Single_Instance
Impact Metrics:Confidentiality (C): None
Integrity (I): Partial
Availibility (A): None
Vulnerability Type:CWE-79
Vulnerability Consequences:Cross-Site Scripting
References:Source: MITRE
Type: CNA
CVE-2015-4944

Source: CONFIRM
Type: Patch, Vendor Advisory
http://www-01.ibm.com/support/docview.wss?uid=swg21963973

Source: CCN
Type: IBM Security Bulletin 1963973
Cross-Site Scripting Security Vulnerability in IBM Maximo Asset Management (CVE-2015-4944)

Source: XF
Type: UNKNOWN
ibm-maximo-cve20154944-xss(104517)

Vulnerable Configuration:Configuration 1:
  • cpe:/a:ibm:change_and_configuration_management_database:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:change_and_configuration_management_database:7.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.7:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.8:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.9:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.10:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.11:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.12:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1.13:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.7:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5.0.8:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.6.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management_essentials:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management_essentials:7.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_energy_optimization:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_government:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_life_sciences:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_nuclear_power:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_oil_and_gas:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_transportation:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.3:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.4:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_for_utilities:7.5.0.6:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:smartcloud_control_desk:7.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:tivoli_asset_management_for_it:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:tivoli_asset_management_for_it:7.2:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:tivoli_service_request_manager:7.1.0:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:tivoli_service_request_manager:7.2.0.0:*:*:*:*:*:*:*

  • Configuration CCN 1:
  • cpe:/a:ibm:maximo_asset_management:7.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.5:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.1.1:*:*:*:*:*:*:*
  • OR cpe:/a:ibm:maximo_asset_management:7.6:*:*:*:*:*:*:*

  • * Denotes that component is vulnerable
    BACK
    ibm change and configuration management database 7.1
    ibm change and configuration management database 7.2
    ibm maximo asset management 7.1
    ibm maximo asset management 7.1.1
    ibm maximo asset management 7.1.1.1
    ibm maximo asset management 7.1.1.2
    ibm maximo asset management 7.1.1.5
    ibm maximo asset management 7.1.1.6
    ibm maximo asset management 7.1.1.7
    ibm maximo asset management 7.1.1.8
    ibm maximo asset management 7.1.1.9
    ibm maximo asset management 7.1.1.10
    ibm maximo asset management 7.1.1.11
    ibm maximo asset management 7.1.1.12
    ibm maximo asset management 7.1.1.13
    ibm maximo asset management 7.5.0.0
    ibm maximo asset management 7.5.0.1
    ibm maximo asset management 7.5.0.2
    ibm maximo asset management 7.5.0.3
    ibm maximo asset management 7.5.0.4
    ibm maximo asset management 7.5.0.5
    ibm maximo asset management 7.5.0.6
    ibm maximo asset management 7.5.0.7
    ibm maximo asset management 7.5.0.8
    ibm maximo asset management 7.6.0.0
    ibm maximo asset management essentials 7.1
    ibm maximo asset management essentials 7.5
    ibm maximo for energy optimization 7.1
    ibm maximo for government 7.1
    ibm maximo for government 7.5.0.0
    ibm maximo for government 7.5.0.1
    ibm maximo for government 7.5.0.2
    ibm maximo for government 7.5.0.3
    ibm maximo for government 7.5.0.4
    ibm maximo for government 7.5.0.5
    ibm maximo for government 7.5.0.6
    ibm maximo for life sciences 7.1
    ibm maximo for life sciences 7.5.0.0
    ibm maximo for life sciences 7.5.0.1
    ibm maximo for life sciences 7.5.0.2
    ibm maximo for life sciences 7.5.0.3
    ibm maximo for life sciences 7.5.0.4
    ibm maximo for life sciences 7.5.0.5
    ibm maximo for life sciences 7.5.0.6
    ibm maximo for nuclear power 7.1
    ibm maximo for nuclear power 7.5.0.0
    ibm maximo for nuclear power 7.5.0.1
    ibm maximo for nuclear power 7.5.0.2
    ibm maximo for nuclear power 7.5.0.3
    ibm maximo for nuclear power 7.5.0.4
    ibm maximo for nuclear power 7.5.0.5
    ibm maximo for nuclear power 7.5.0.6
    ibm maximo for oil and gas 7.1
    ibm maximo for oil and gas 7.5.0.0
    ibm maximo for oil and gas 7.5.0.1
    ibm maximo for oil and gas 7.5.0.2
    ibm maximo for oil and gas 7.5.0.3
    ibm maximo for oil and gas 7.5.0.4
    ibm maximo for oil and gas 7.5.0.5
    ibm maximo for oil and gas 7.5.0.6
    ibm maximo for transportation 7.1
    ibm maximo for transportation 7.5.0.0
    ibm maximo for transportation 7.5.0.1
    ibm maximo for transportation 7.5.0.2
    ibm maximo for transportation 7.5.0.3
    ibm maximo for transportation 7.5.0.4
    ibm maximo for transportation 7.5.0.5
    ibm maximo for transportation 7.5.0.6
    ibm maximo for utilities 7.1
    ibm maximo for utilities 7.5.0.0
    ibm maximo for utilities 7.5.0.1
    ibm maximo for utilities 7.5.0.2
    ibm maximo for utilities 7.5.0.3
    ibm maximo for utilities 7.5.0.4
    ibm maximo for utilities 7.5.0.5
    ibm maximo for utilities 7.5.0.6
    ibm smartcloud control desk 7.5
    ibm tivoli asset management for it 7.1
    ibm tivoli asset management for it 7.2
    ibm tivoli service request manager 7.1.0
    ibm tivoli service request manager 7.2.0.0
    ibm maximo asset management 7.1
    ibm maximo asset management 7.5
    ibm maximo asset management 7.1.1
    ibm maximo asset management 7.6